Ballvalve
General Engineering Contractor
Some air flow designer sent me a plan for a package unit.
He has [2] 10" flex coming out of the plenum... One run is 50'+ and he has [6] 6" outlets on it.
Second run he converts to 8" after 10' of 10", runs 40', and takes off [2] 6" vents
Its a 2 ton 50,000btu rig. Is that sensible?
He has [2] 10" flex coming out of the plenum... One run is 50'+ and he has [6] 6" outlets on it.
Second run he converts to 8" after 10' of 10", runs 40', and takes off [2] 6" vents
Its a 2 ton 50,000btu rig. Is that sensible?