Here is the layout and I am questioning the need to have the purple segment
the green blue selected segment is already in place, the green segment between the shower vent and the sink is what I am building (still dry fitting the pieces but I did not drill the holes for the studs to the left of the vertical green segment
As mentioned the distance between the two green verticals is 4'
this is all 1.5" ABS pipe
I am also considering an air admittance valve
the green blue selected segment is already in place, the green segment between the shower vent and the sink is what I am building (still dry fitting the pieces but I did not drill the holes for the studs to the left of the vertical green segment
As mentioned the distance between the two green verticals is 4'
this is all 1.5" ABS pipe
I am also considering an air admittance valve