gerryuml
New Member
Hey guys,
I wanted to get your take on the following diagrams I have attached. One pdf is of the idea of what my new basement bathroom will look like and the other is a diagram of the piping I am going to embed in the concrete early next week. I am going to be cutting the concrete and digging a perimiter drain for my sump over the weekend and wanted to get the rough in set in before I refil over the sump drain lines.
I am planning to only use the vent from the ejector pit to vent this creation, I wanted to know if that would not be enough or if I could go smaller than 2" piping to the shower and sink?
Also, I was planning to get the plastic ejector liner at Home Depot. Does anyone have any experience with that?
Thanks for your input!
Gerry..
P.S. I did look for similar posts but could not find an old one I ran accross about a year ago with a diagram of a rough in.
I wanted to get your take on the following diagrams I have attached. One pdf is of the idea of what my new basement bathroom will look like and the other is a diagram of the piping I am going to embed in the concrete early next week. I am going to be cutting the concrete and digging a perimiter drain for my sump over the weekend and wanted to get the rough in set in before I refil over the sump drain lines.
I am planning to only use the vent from the ejector pit to vent this creation, I wanted to know if that would not be enough or if I could go smaller than 2" piping to the shower and sink?
Also, I was planning to get the plastic ejector liner at Home Depot. Does anyone have any experience with that?
Thanks for your input!
Gerry..
P.S. I did look for similar posts but could not find an old one I ran accross about a year ago with a diagram of a rough in.
Attachments
Last edited: