I'm planning to add a third bathroom to the 2nd floor of my house. Currently the main branch supplying the house is 3/4". The line coming into the house before the meter is 3/4". If I'm reading the pipe size charts correctly, it appears that the branch after the meter should be 1". Is this correct? I came up with 32.5 fixture units for the entire house including the fixtures for the new bathroom.
1 Bar Sink
1 Bath/Shower
1 Clothes Washer
1 Dishwasher
2 Hose Bibs
1 Kitchen Sink
1 Laundry Sink
3 Bathroom Sinks
2 Showers
3 Toilets
Thanks!
https://terrylove.com/watersize.htm
1 Bar Sink
1 Bath/Shower
1 Clothes Washer
1 Dishwasher
2 Hose Bibs
1 Kitchen Sink
1 Laundry Sink
3 Bathroom Sinks
2 Showers
3 Toilets
Thanks!
https://terrylove.com/watersize.htm
Last edited by a moderator: