Starting a thread of all the messed up installations I run into while estimating remodel projects.
Under a small 3/4 bath we're converting to a powder room. Yeah.. won't be using this connection. Its back graded because the weight of the stack is... wait for it...
How its plumbed on the exterior. We don't need a vent.. nor fittings, just weld the galvie to the cast stack.
You're short on funds.. no problem, we'll only install half of the stack.
Under a small 3/4 bath we're converting to a powder room. Yeah.. won't be using this connection. Its back graded because the weight of the stack is... wait for it...
How its plumbed on the exterior. We don't need a vent.. nor fittings, just weld the galvie to the cast stack.
You're short on funds.. no problem, we'll only install half of the stack.