TheZster
Member
Just finished cementing my 3" toilet drain in my basement bathroom addition. Unfortunately, during the filling/concreting, etc., I ended up with 12 1/2 from the center of the drain to the new wall studs (no drywall yet). Appears I'm going to end up with a 12 inch distance once drywall is installed. I know I need 12 1/2 from the wall - but figure it will be easier to back the wall a tad in that area than remove the new concrete.... Thoughts??? Yeah, I know - measure twice - cut once...... Darn!!