I have a submersible pump that was dropped without a safety rope tied off. Well is six inches inside diameter, 320 feet deep, but there is 250' of 1 1/2" pvc still attached to the pump, which is now resting on the bottom of the well. Water line is close to grade level. Well is drilled straight down.
Any ideas outside of drill a new well- 5K, and 'call a guy'- already called two, would be much appreciated. I have a theory that I am working on, but wanted to hear some other, more knowledgeable, opinions! Thank you