Nwtexan
New Member
Hello,
I’m rebuilding our 3 house shared well system(class b). I’m going to install a small manifold with meters and new valves to each house. Currently each line has old metal valves that have been buried for a number of years. The pipe is all schedule 40 1 1/4”
Because of the rigidity of the pipe and the small trenched area, replacing with a standard coupling and pipe will be really difficult. I know the repair couplings are made for this but I have heard that they are prone to leaking.
What is best practice in this situation. This part of the pipe will be buried and will not be part of the access area.
Thanks for your info and thoughts
Best
Ian
I’m rebuilding our 3 house shared well system(class b). I’m going to install a small manifold with meters and new valves to each house. Currently each line has old metal valves that have been buried for a number of years. The pipe is all schedule 40 1 1/4”
Because of the rigidity of the pipe and the small trenched area, replacing with a standard coupling and pipe will be really difficult. I know the repair couplings are made for this but I have heard that they are prone to leaking.
What is best practice in this situation. This part of the pipe will be buried and will not be part of the access area.
Thanks for your info and thoughts
Best
Ian