Hi all,
I’m changing the configuration of the basement bathroom / laundry room and need to relocate the standpipe to the opposite wall. This will end up right in front of the main line out to my septic tank.
Im looking for a sanity check on my plan to move the standpipe and AAV closer.
The 1-1/2” coming in from around the corner is the existing Landry drain - it’s roughly 8ft away and currently vented with an AAV. The 3/4” is a drain from a Saniflo macerator which serves the toilet, sink and shower.
The red arrow shows about where I would cut in my new elbow to the existing work. In the second diagram, everything to the right of the red line is existing, to the left is the new work.
Planning to do the work myself, but may end up hiring out if I am totally off base with this plan.
Any feedback would be appreciated!
I’m changing the configuration of the basement bathroom / laundry room and need to relocate the standpipe to the opposite wall. This will end up right in front of the main line out to my septic tank.
Im looking for a sanity check on my plan to move the standpipe and AAV closer.
The 1-1/2” coming in from around the corner is the existing Landry drain - it’s roughly 8ft away and currently vented with an AAV. The 3/4” is a drain from a Saniflo macerator which serves the toilet, sink and shower.
The red arrow shows about where I would cut in my new elbow to the existing work. In the second diagram, everything to the right of the red line is existing, to the left is the new work.
Planning to do the work myself, but may end up hiring out if I am totally off base with this plan.
Any feedback would be appreciated!