Hi All,
I'm finishing my basement and preparing my bathroom plumbing. The house was built with rough plumbing for a bathroom but it was 50 years ago and the layout allowed only a narrow shower. We decided that the toilet riser needs to be moved about a foot to the left in order to widen the shower.
What you see in the pick is the 3'x3' hole I broke with the existing layout dug up. I have the 4" toilet drain, 2" shower pipe and the lav waste/wet vent coming from the wall which is a 3" CI below the clean out.
Before breaking the concrete, I assumed the main drain was routed from below the cleanout at a 90 towards the main sewer exit which is 30ft behind me (bottom of the pic), and I would be able to just stack the new toilet riser on top of the existing drain. However, it ended up going to the left towards what I guess is a main pipe that goes down the centerline of the house.
Now my problem is that if I want to plumb this correctly, I understand it has to be ordered wet vent > shower > toilet > sewer main in order to pass nj plumbing code. The issue is if I stack 3 fittings starting at the wet vent, I am way too far to the left with my toilet riser. I need the toilet flange to be roughly in line with the clean out (+- 2").
I was looking for a fitting like a double wye that can pick up the 3" wet vent and 2" shower together but there is no such specific fitting and also AI flagged it as not up to code since the double wye connections will allow waste water to go upstream in the opposite pipe.
What advice can I get to solve this problem? Preferably with the least amount of heavy demo if possible.
Much appreciated in advance!
I'm finishing my basement and preparing my bathroom plumbing. The house was built with rough plumbing for a bathroom but it was 50 years ago and the layout allowed only a narrow shower. We decided that the toilet riser needs to be moved about a foot to the left in order to widen the shower.
What you see in the pick is the 3'x3' hole I broke with the existing layout dug up. I have the 4" toilet drain, 2" shower pipe and the lav waste/wet vent coming from the wall which is a 3" CI below the clean out.
Before breaking the concrete, I assumed the main drain was routed from below the cleanout at a 90 towards the main sewer exit which is 30ft behind me (bottom of the pic), and I would be able to just stack the new toilet riser on top of the existing drain. However, it ended up going to the left towards what I guess is a main pipe that goes down the centerline of the house.
Now my problem is that if I want to plumb this correctly, I understand it has to be ordered wet vent > shower > toilet > sewer main in order to pass nj plumbing code. The issue is if I stack 3 fittings starting at the wet vent, I am way too far to the left with my toilet riser. I need the toilet flange to be roughly in line with the clean out (+- 2").
I was looking for a fitting like a double wye that can pick up the 3" wet vent and 2" shower together but there is no such specific fitting and also AI flagged it as not up to code since the double wye connections will allow waste water to go upstream in the opposite pipe.
What advice can I get to solve this problem? Preferably with the least amount of heavy demo if possible.
Much appreciated in advance!