mswvette
New Member
I have a 1 1/4" main line from city water into a new construction.
I will have a fitting to transfer from plastic pipe to brass then a pressure gauge then main shutoff.
I have a wye filter, backflow preventer, pressure regulator, another guage and another shutoff to be able to service the parts.
See picture of planned layout. Do I have too many unions, not enough to just right?
I will have a fitting to transfer from plastic pipe to brass then a pressure gauge then main shutoff.
I have a wye filter, backflow preventer, pressure regulator, another guage and another shutoff to be able to service the parts.
See picture of planned layout. Do I have too many unions, not enough to just right?