Hello all - you really helped me out last time - so thanks to everyone involved 
Just a quick question really (i know you would need to see the job) but generally speaking....
If i was to ask for a quote to get my second bathroom done:
Demo (including disposal) plumbing, tiling (walls and floor).
it includes:
room dimensions are L, W, H 10ft x 7ft x 9ft
complete demo: walls, ceiling and fixtures (sink/lav, bath, toilet/closet)
1 New sink install (boxed at present) sits in a vanity box. (needs assembling)
2 new bath install (this would inc framing out ready for bath) and wall mounted shower
3 tiling around bath (5ft x 5ft) and complete shower wall (2.5ft x 5ft)
4 levelling, securing floor + tiling floor
basically i would be lookinig for an estimate, low and high. I dont want to get ripped off as im not used to having someone else do the work...im just too busy to do this myself at the mo (work commitments/computer stuff)
many thanks for any help
and once again, i know you would have to see the job but - no plumbing needs to be redone extensively - its just a straight forward rip out and put back sort of thing (obviously there may be some investigational work to be done) but on the whole everything is in decent condition
QUOTE IS FOR LABOUR ONLY as i would cover all materials
thanks for your time and input
novicepiper
Just a quick question really (i know you would need to see the job) but generally speaking....
If i was to ask for a quote to get my second bathroom done:
Demo (including disposal) plumbing, tiling (walls and floor).
it includes:
room dimensions are L, W, H 10ft x 7ft x 9ft
complete demo: walls, ceiling and fixtures (sink/lav, bath, toilet/closet)
1 New sink install (boxed at present) sits in a vanity box. (needs assembling)
2 new bath install (this would inc framing out ready for bath) and wall mounted shower
3 tiling around bath (5ft x 5ft) and complete shower wall (2.5ft x 5ft)
4 levelling, securing floor + tiling floor
basically i would be lookinig for an estimate, low and high. I dont want to get ripped off as im not used to having someone else do the work...im just too busy to do this myself at the mo (work commitments/computer stuff)
many thanks for any help
QUOTE IS FOR LABOUR ONLY as i would cover all materials
thanks for your time and input