Engineeraaron
New Member
I’m adding a full bathroom in my basement. The plumbing was roughed in, and a toilet was already added by the previous owner. I just want confirmation on what I need to do to complete the shower drain/vent plumbing.
I believe all I need to do is add a P trap to the 2” drain line in the concrete cutout. After that, I need to connect the 2” vent stub up to the main vent pipe.
see attached pictures. Thank you.
I believe all I need to do is add a P trap to the 2” drain line in the concrete cutout. After that, I need to connect the 2” vent stub up to the main vent pipe.
see attached pictures. Thank you.
Attachments
-
4508F3F1-82FC-40FF-B89D-9E86096074DC.jpeg55.3 KB · Views: 148
-
194E2D75-2747-4E05-81E2-17BA895CBE02.jpeg64.7 KB · Views: 157
-
343F22FA-C9C8-4AD7-8F73-DF8FC8E76E79.jpeg91.6 KB · Views: 154
-
DADCD5B6-492F-4932-8A4D-8DEC97C34B44.jpeg96.2 KB · Views: 150
-
CA5C9857-081F-480E-93D5-0FA4144F38A5.jpeg91.6 KB · Views: 146