Chrisexv6
Member
About to finalize the install of my Delta tub drain. REALLY disappointed in the lack of good instructions, but I suppose the products could just be meant for a plumber to install instead of a homeowner.
Anyway, Im at the point where I need to determine the linkage length for the plunger. Following the cryptic instructions, it seems the linkage is too long........it definitely seals the drain when in the down position, but when in the up position it only creates a small opening for water to drain out. Im thinking the opening should be bigger, and I would assume the linkage needs to be shorter to do this. However, I already have it hooked at the highest it can go on the adjustable clevis.
Does the first part of the linkage need to be shortened by cutting? Im not sure how a plumber would do it, or maybe its just fine and shouldnt be changed (rather, how big should the opening be when the plunger is opened?)
Thanks in advance.
-Chris
Anyway, Im at the point where I need to determine the linkage length for the plunger. Following the cryptic instructions, it seems the linkage is too long........it definitely seals the drain when in the down position, but when in the up position it only creates a small opening for water to drain out. Im thinking the opening should be bigger, and I would assume the linkage needs to be shorter to do this. However, I already have it hooked at the highest it can go on the adjustable clevis.
Does the first part of the linkage need to be shortened by cutting? Im not sure how a plumber would do it, or maybe its just fine and shouldnt be changed (rather, how big should the opening be when the plunger is opened?)
Thanks in advance.
-Chris