Bob Foley
New Member
I am looking to add a sink and toilet, small powder room bath to my home. Couple of questions: Is it acceptable to tie into the soil pipe clean out that heads out from the basement? There is a 4" cleanout and my proposal is to put in a 4">>>3" hex bushing, then a sked 80 PVC male adapter, then a WYE or long sweep elbow with a clean out on its 'away from the wall' end to replace the existing cleanout plug. Then up to the floor for the fixtures drains and vents.
Is is OK to tie into the existing cleanout fitting (which is CI) as described?
Thanks
Is is OK to tie into the existing cleanout fitting (which is CI) as described?
Thanks