Search results

  1. M

    Basement Plumbing Rough In

    I am tying into a 4" Cast Iron soil line running under my concrete slab. The soil stack serves an additional bathroom (8 FU) located on the first floor and vents out the attic through 3" galvanized steel. Questions: 1) Overall plan; any problems? 2) Should I vent to the attic with a...
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks