Re: Final connections - - after rough-in
Posted by hj on May 13, 2003 at 00:12:08:
In response to Re: Final connections - - after rough-in
Inspectors do not allow bending copper tubing, so you will have to use fittings and solder.

: I am awaiting the roughin inspection and I am courious about the next step.
: I am pretty sure that I was not lucky/skillfull enough to line up my ball valves where my hot an cold inlets are needed for my corner tub faucet and my neo-angle shower faucet.
: Do "the pros" tend to use pipe benders to get the offsets and angles needed, or am I looking at sweating fittings ?




Replies to this post