Re: Bathroom remodel
Posted by Gary Swart on March 16, 2003 at 18:35:10:
In response to Re: Bathroom remodel
Basically, the order of operations is to rough-in the plumbing, frame the walls and alcove for a shower and/or tub, then do the wiring. After that, put down the floor and do the drywall. After the floor is down and walls are covered, you can finish the plumbing connections and set the toilet.


Replies to this post
There are none.