Remodeling Bathroom


[ Follow Ups ] [ Post Followup ] [ Terry's WWWBoard ] [ FAQ ]

Posted by Ralph Varney on February 24, 2003 at 15:24:45:

I'm currently remodeling my bathroom. I have completely stripped all walls, fixtures and wiring out. I have replaced the walls with drywall and I'm almost ready to paint them. All wiring is pulled to new boxes.

My question is, what order should I do the tasks I have left?

Unlayment of the floor and tile.
Install stand-up shower (plumbing and flooring under the shower is in place)
Paint all walls and ceiling.
Install toilet and pedestal sink. (I figured this would be last)

Did I forget anything? (that you can tell?)


Follow Ups:



Post a Followup

Name:
E-Mail:

Subject:

Comments:

Optional Link URL:
Link Title:
Optional Image URL:


[ Follow Ups ] [ Post Followup ] [ Terry's WWWBoard ] [ FAQ ]