Bldg. Permit Requirement: Hydrolic Analysis???
Posted by Robert E. Kaplan on January 13, 2003 at 17:55:18:
My locality is trying to harrass me into spending $3k for a new, larger, water meter. The only way I can avoid it is to provide them with a "Hydrolic analysis calculation" in which we "address velocity in clear, concise manner". They also referred to table 6-5 1997 uniform plumbing code.

Any one have any suggestions how to deal with this? What are they looking for? Do I have to hire some engineer?

PS My water pressure is just fine.

Thanks, A LOT, for any help.

Rob


Replies to this post