I should have been more specific as to what I wanted to accomplish. My boiler is approx 30 years old and it seems to be on it's last legs. If I had the boiler replaced I wanted to have the levels zoned at the same time. I don't think I would need a new piping job since each level has it's own set of pipes. Thanks for your response, Lee : Why would you replace the boiler, not a furnace, and the process of rezoning it would vary depending on how the system is installed. It could range from just installing three zone valves, or it could require a complete repiping job. : : Hi everyone,
|
|