| Posted by Matt Leahy on June 03, 2002 at 14:54:13: | |
|---|---|
| In response to Re: Cast Iron Hub Fitting with 3.12 ID Hub | |
|
: Without being there it is impossible to tell if things are just not fitting together properly. But it is possible that they won't since the lead hub was never designed to have the "donut" installed in it, so it could have the wrong dimensions. : : : Matt, : : I was finally able to get the donut seal to work by placing a 2" coupler on the end of the pipe. The larger OD made the seal work properly. Thanks for the help and the great site. |
|
| Replies to this post |
|