| Posted by Mark on February 18, 2002 at 05:09:51: | |
|---|---|
|
What's required to hold a recessed steel tub installation in place? Are the ledger boards and roofing nails enough, or do I also trowel some adhesive on the floor? Thanks |
|
| Replies to this post |
|