Re: shower installation for tile guy


[ Follow Ups ] [ Post Followup ] [ Back to Terry Love's WWWBoard ] [ FAQ ]

Posted by Terry Love on March 30, 19100 at 20:25:10:

In Reply to: shower installation posted by kathrina patoka on March 30, 19100 at 13:47:35:

: We are remodeling our master bath. The tile contractor tells us to prep the area for the shower prior to the the guy hot mopping it. I'm not sure what exactly I'm supposed to do...something about building up the sides of the shower. Also some confusing information about the drain (there is just a pipe there now). Any suggestions?

The link below will have some info and pictures. It will show what the drain should look like too. Terry




Follow Ups:



Post a Followup

Name:
E-Mail:

Subject:

Comments:

Optional Link URL:
Link Title:
Optional Image URL:


[ Follow Ups ] [ Post Followup ] [ Back to Terry Love's WWWBoard ] [ FAQ ]