Replacing Shower down to studs & plywood!
Posted by Bill Varian on March 15, 19100 at 22:49:54:
I have torn out my stand up shower stall down to the 2x4 walls and plywood floor. I have ordered new tile and concrete board for the walls...
I have an old existing lead liner secondary containment which has a slight crack on it.
Can the lead liner be repaired, somehow? or should I just say don't chance it and remove it?

If I have to replace it should I put new plastic 2" drain in and connect it to the copper pipes I have?

How exactly does the floor drain connect to the new liner,if I go that route, and get a proper seal?
what is the proper method for installing the new liner and drain in the floor, Please give fairly detailed!
Thanks, Bill


Replies to this post