| Posted by donna on July 30, 1998 at 18:10:36: | |
|---|---|
|
We have a 2 pc bath below ground in a split entry and have space in the room for a shower. The floor is concrete plus spacers and plywood sub floor with tiles. In order to install one without digging into the concrete for plumbing and drainage is there any pro- blem with installation above the slab and boxing in the pipes. The shower itself would be up a step from the existing bathroom floor to allow drainage under the unit? |
|
| Replies to this post |
|