No rough-in plumbing in basement to be finished
Posted by Jan on February 18, 19100 at 12:45:24:
I am planning to finish-off my basement, and hopefully include a bathrooom (Toilet / shower / basin). What are my options? Does one have to cut out the basement concrete floor to tie up with existing plumbing, or are other devices (macerating toilet etc) an option to connect above the floor?


Replies to this post
There are none.