Incomplete Bathroom Remodeling Company
Posted by John on February 05, 19100 at 08:50:21:
I paid a company $3100.00 to remodel my bathroom.
They installed new walls, tiles, bathtub, toilet,
shower faucets, etc.
I found this company from Improve Net. They completed
the remodel on 1/21/00 with one exception, they could not get the old shower head and short pipe off as it was "frozen" and in the process they messed up the old
shower head and now it is very difficult to move as they ruined the ballhead.
The new shower head and short pipe is sitting in a box
and I really consider this an incomplete job besides the fact that the old shower head is worse now than before they began. What should I do at this point?


Replies to this post