Re: Thanks Terry for old plumbing answer but job just got bigger..
Posted by hj on September 16, 1999 at 08:51:29:
In response to Re: Thanks Terry for old plumbing answer but job just got bigger..
If only all your problems were so easy to fix. It just requires melting out the existing lead joint, and installing a new cast-iron closet bend. The hardest part is pouring the horizontal joint, which for a plumber is no problem at all. An hour, two at the most for a slow plumber, and a little bit of material.

: After we removed the subfloor we could see a crack in the pipe to the tolet. I guess it is time to call a
: plumber. How much do you think it will cost?