| Posted by brain on February 26, 19101 at 10:22:23: | |
|---|---|
|
I am in the middle of re-doing my shower stall. I have the slopped mortar bed in place and am preparing to install the pan liner. Once the liner is in should I run Wonderboard all the way down the walls to the liner and then lay themortar bed or should I stop the WB 1"-2" above the liner and mud up to the WB? |
|
| Replies to this post |
| There are none. |