Re: Installing a shower base on a lower level concrete floor.
|
Posted by Terry Love on October 03, 1998 at 15:34:58:
|
|
In response to Re: Installing a shower base on a lower level concrete floor.
|
 Dick, Most installations of cultured marble bases, use either the mortar or fixall to level the base. The important things are to: Mark the floor for the trap center. Set the base down to get the measurement for the vertical pipe that fits between the p-trap and the shower drain. Remove pan, lay down the (fixall or mortar). Install pan, and wait for the (fixall or mortar) to set up before standing on the pan.
|
|
Replies to this post
|
|
There are none. |