Shower stall refresh process

SAO

New Member
Messages
2
Reaction score
0
Points
0
Location
Virginia
I am in the process of refreshing my shower stall. I have removed the old shower door and removed the old caulk. I will be having a local glass contractor install a new shower door this week. Should I caulk between the shower base and the tile before I have the new shower door installed, or should I wait until after the door install is complete?
 
Back
Top