My old cast iron 4" main stack does not have a clean plug, but I am going to add one in my remodel. Does my new secondary 3" stack going up to the attic also have to include a cleanout plug? Or does the cleanout on main stack serve as the cleanout for that stack as well? Lastly, where do these test tees go? Are they mandatory?
EDIT: I have had (2) plumbers tell me that toilet is actually a cleanout on a vertical run, which makes sense, because if the toilet is removed, I could easily snake this 3" secondary stack. Understanding again, that this may not be the ideal location. However, I am tight for space in the basement and do no want to add another 3" tee or wye in my secondary stack if I do not have to.