I would like to put a full bathroom in my basemnt. toilet-sink-shower. there are two white caps flush with the slab floor. ( 4in ). I believe one or both are the drain rough in. they are about six in. apart on centre. the one closest to the vertical drain is a tee. some how connected to the stack drain for the laundry. the other one has cold air rising from it when the cap is removed ( it appears to be a 90deg elbow of some sort. Both seem to be too close to wall for a toilet. so i think i wil be busting some concrete. any suggestions on how to connect all my plumbing ( drain ) needs. what is the second rough in for?