New drain question

ilya

In the Trades
Messages
104
Reaction score
1
Points
16
Location
Akron Ohio
hi everyone. Please do tell the maximum total degrees of bend permissible before a drain joins the main stack under IPC? I couldnt do a search that wanted to work. Thanks
 
Your question is ambiguous. It is usually 135 degrees before the vent, but after the vent there is no limitation other than there be cleanouts whenever the line turns more than a total of 90 degrees.
 
Last edited:
Back
Top