Forgot to mention...the existing stack runs under the basement floor and out to the street. Plan is to start cutting the floor along the existing floor drain closest to the new bathroom to find the line. Instead of running another vent through to the roof, I plan to tie in the vent to the existing (dry) vent above the 1st floor bathroom's fixtures. There is no plumbing on the second floor (finished attic space).