it's just a side patio 9x25. SHouldn't take
more than 2.75 cubic yards of concrete.
The forms are practically made since there's
my concrete exterior house wall to the left,
a wooden fence to the right, landscaped wood at
the end of the patio, and where I'm standing in the pic
there's also the wooden fence with a door. I'll call
locally, but wanted a general idea of cost, time, and ease of
job from you all 1st. Also, most likely the truck could get it's
pour extension arm(if thats what its called) to reach this area.
thanks!
more than 2.75 cubic yards of concrete.
The forms are practically made since there's
my concrete exterior house wall to the left,
a wooden fence to the right, landscaped wood at
the end of the patio, and where I'm standing in the pic
there's also the wooden fence with a door. I'll call
locally, but wanted a general idea of cost, time, and ease of
job from you all 1st. Also, most likely the truck could get it's
pour extension arm(if thats what its called) to reach this area.
thanks!