Not sure what "floor leveler" you used, but typically that stuff offers no strength other than in compression. I would cut out a piece of the old subfloor big enough to span 3 joist bays, then sister the outside joists and screw in a new piece of plywood. That might require replacing the toilet flange, which should be mounted on top of whatever the finish floor is. SInce you have access from below, that shouldn't be as bad a job as it sounds.