You do not specify exactly how you made the 2" connection, but from your description it appears that you should have installed a vent on the 2" line to the shower. Especially since the toilet will be flushing past the 2" opening. Normally you would not use a "glued" shower drain, but rather one with a rubber gasket that is inserted after you set the shower drain over the pipe, which should be the proper distance above the concrete floor. That distance depends on the exact drain you use.





Reply With Quote
Bookmarks