Other than properly supporting pipes that are above, any tips for cutting C.I. vertical waste stack with snap cutters? I have already built a soffit around the pipe and will use steel riser clamps above and below the cut.

Any tips for measuring or cutting if I'm going to use a 3 x 3 x 3" PVC wye and two banded couplings?

Here's a quick sketch of my plan. Sorry if the drawing is messy. I'm a terrible sketch artist. The pipe is going 45 degrees for a bit to clear our laundry chute. Once clear, it'll turn up 45 degrees and then take a long sweep 90 degree turn or a turn with two 45's and a straight pipe to a horizontal waste pipe sloped at 1/4" per foot. Then it's heading up the wall to the attic.

Thanks.

I included a second sketch with a Wye fitting and a cleanout. It's a good spot for one.
 

Attachments

  • vertical stack.jpg
    vertical stack.jpg
    18.3 KB · Views: 293
  • vertical stack with cleanout.jpg
    vertical stack with cleanout.jpg
    6.4 KB · Views: 281
Last edited:

Master Plumber Mark

Sensitivity trainer and plumber of mens souls
Messages
5,533
Reaction score
354
Points
83
Location
indianapolis indiana - land of the free, home of
Website
www.weilhammerplumbing.com
more is better

its better to cut out far more than you really

need to ..... give yourself PLENTY of room to navigate

youir fittings into place or you will live to regret it......


an extra 18 inches of PVC pipe in that stack is not going to matter


but trying to cut another 3 inches off after you have

already tied into it can be a fun time......
 

Tbplumbloco

New Member
Messages
60
Reaction score
0
Points
0
Location
Ohio
tips for snap cutters

Yo Coach! Ditto on the 3"pvc wye,give your self some flex w/the pvc pipe,your going to run 3"pvc up to the attic any-way.
 

Coach606

New Member
Messages
144
Reaction score
0
Points
0
Location
Illinois
Thanks...

Great tips... I'll let you know how it goes.

My project has stalled a bit as we've run into some more zoning hassles. It's pretty amazing what you can go through just to do a little work on your own house! I'm not even building out, just trying to change a dormer already there so my stairs can meet code. Soon as I clear that hurdle I get hit with another one regarding height clearance above bathroom fixtures, a problem that exists because zoning prevented me from building a dormer there in the first place! Now it's another five weeks and a second zoning variance! Hopefully, in the end they'll let me build.

Anyway, I have time off right now so I'd really like to tie into the stack and run the dwv and supply up to the attic. Then I'd have to wait until we get the electric done, clear zoning again, and get the second dormer built to really start roughing in the bathroom.

I may run the supplies up to the attic and then wait. But is it okay to tap the stack, make my horizontal run and the run it up a floor and cap it in preparation for when the upstairs is ready to rough in? I figure I can just cap it off and no sewer gasses would get in. Then again, the pipe would be in my daughter's room, who is just about two years old.

Is capping the line okay or should I just wait until I can send the pipe through the roof? If I can tie into the stack and run the pipe up to the second floor, then I can begin building some soffits and feel like I'll have a good chunk of work done before I head back to my day job and have limited time and energy for plumbing.

Any opinions? Is capping it safe or do you not feel safe until it's through the roof?
 

Tbplumbloco

New Member
Messages
60
Reaction score
0
Points
0
Location
Ohio
tips for snap cutters

Yes,capping or plugging the drain until your ready to move on with your project is adequate.
 

Lakee911

I&C Engineer (mostly WWTP)
Messages
1,254
Reaction score
1
Points
0
Location
Columbus, OH
Bud1300 said:
Cut more than you need and you can install the fitting with no-hub bans and pvc to no-hub adapt.


Do you need this PVC to no-hub adapter?. This doohickey (technical term) was installed in my CI stack where they replaced with PVC before I bought the house. The no-hub side seems to be the same diameter as the PVC. Is it necessary?

(By the fact that they used the said doohickey, makes me think a pro did it, but they also didn't support the upper section of pipe and it pulled loose 'upstream' :( Posted previously about that...)

Jason
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks