Hi,
We are in process of building the bathroom in our basement. The plumbing was roughed in by the builder. There is a 3" pipe and around it there is some space. Concrete floors. Our problem is that when we put the flange on the pipe, all holes where the flange is supposed to be screwed to the floor are above that space that is around a pipe, so basically, we have no concrete to attached to flange to.
What should we do?
thanks
We are in process of building the bathroom in our basement. The plumbing was roughed in by the builder. There is a 3" pipe and around it there is some space. Concrete floors. Our problem is that when we put the flange on the pipe, all holes where the flange is supposed to be screwed to the floor are above that space that is around a pipe, so basically, we have no concrete to attached to flange to.
What should we do?
thanks