Hi, there. Great forum; first post here. Lots of pretty pictures below...
I am adding a shower, toilet and sink to my unfinished basement. My question/problem relates to my shower. I am adding a Maax "Premium" shower kit (model K3874F-W05). Before construction I took the base dimensions off the box which said the 2" shower drain is 12" by 12" off the walls. See pic off of the box sticker:
Other diagrams on the box showed the panels being installed against wallboard (no studs visible):
I therefore assumed I'd have my 1/2" drywall and cement board all in place before adding the shower base and walls so I added an extra 1/2" to the dimensions. With my 1/2" cement board in place, the drain perfectly matches up at 12" by 12" assuming the shower base goes against the cement board. See pic of my basement where you can see the extra 1/2" measurement line:
Here's the problem... As I start to dive into the project, I sadly learn that the base actually goes directly against the studs and the rest of the shower panels attach to the cement board. See pic from inside the manual where they show the wallboard "cut out" to accomodate the shower base:
As you can imagine, in order to attach the shower base to the studs, my 2" PVC drain is no where near to center of the base drain. To fix this, I think my options are...
Any other options you can think of?
I am adding a shower, toilet and sink to my unfinished basement. My question/problem relates to my shower. I am adding a Maax "Premium" shower kit (model K3874F-W05). Before construction I took the base dimensions off the box which said the 2" shower drain is 12" by 12" off the walls. See pic off of the box sticker:
Other diagrams on the box showed the panels being installed against wallboard (no studs visible):
I therefore assumed I'd have my 1/2" drywall and cement board all in place before adding the shower base and walls so I added an extra 1/2" to the dimensions. With my 1/2" cement board in place, the drain perfectly matches up at 12" by 12" assuming the shower base goes against the cement board. See pic of my basement where you can see the extra 1/2" measurement line:
Here's the problem... As I start to dive into the project, I sadly learn that the base actually goes directly against the studs and the rest of the shower panels attach to the cement board. See pic from inside the manual where they show the wallboard "cut out" to accomodate the shower base:
As you can imagine, in order to attach the shower base to the studs, my 2" PVC drain is no where near to center of the base drain. To fix this, I think my options are...
- Add an extra 1/2" of OSB around both walls that surround the tub. This, I think is going to be a pain, because one wall is about 8 feet and the other about 4 feet. I would need to push both walls out a 1/2", move my electrical boxes out a 1/2", deal with an extra 1/2" for the prehung door, etc.
- Dig up the concrete, cut the PVC down and install some type of coupler that will allow me to move the PVC over the little bit I need.
Any other options you can think of?