I'm preparing for the rough inspection of a bathroom basement. I've been told I need to "plug the system and fill the system to 5 feet". I have a sink, toilet, shower draining below slab to sewage basin.
How do I do this? Insert test plugs in the sink, toilet, and shower and then fill the system up until the vent has 5ft of water in it?
Does this mean I need a cleanout 5+feet up to be able to fill?
I guess this also means I need to plug the sewage basin inlet too, right?
How do I do this? Insert test plugs in the sink, toilet, and shower and then fill the system up until the vent has 5ft of water in it?
Does this mean I need a cleanout 5+feet up to be able to fill?
I guess this also means I need to plug the sewage basin inlet too, right?