Firstcut
New Member
- Messages
- 8
- Reaction score
- 0
- Points
- 0
Need to move to new location, about 36 inches. under slab
If I remove old P, run horizontal 2 inch for 36 " to new spot, I will need slope on that 36" run which means new Ptrap will be about 1 inch higher than old one.
Is that a problem, or is there a better method? I don't think I want to run that 36 inch without any slope, right?
If I remove old P, run horizontal 2 inch for 36 " to new spot, I will need slope on that 36" run which means new Ptrap will be about 1 inch higher than old one.
Is that a problem, or is there a better method? I don't think I want to run that 36 inch without any slope, right?