pipe
In most areas you have to use at least a 5' piece of copper at the building and at the water meter, so it makes absolutely no sense to use PVC for the small intermediate section. Besides taking more time to make the connections, the male PVC thread into a female copper fitting will frequently crack due to settling or other stress. I never use PVC for anything less than 100' since up to that length I can use a single piece of copper.