I pulled down existing sheet rock to add a 15 amp and (2) 20 amp wiring and found the existing wiring was stapled to the bottom of the joists. It looks like some type of raceway but I haven't found any information online if this was past practice or not.
Is this the way some people used to wire in the past? I'm guessing the correct way to add any more wires is to drill. I suppose if I added more wires and put the sheet rock back up it would not be good? Thanks in advance