Just wanted to say Hi and yes I'm a newbie to this website. I've been reading different threads before posting to try and keep my questions to a minimal as I'm sure they are basic and everyone except me knows the answer! I'm replacing the drain below the slab in a shower and I have the cast iron pipe cut and ready to re install ABS.

1. Which one or either should I use to connect the CI to ABS? the CI measured closer to 2.5" OD so not sure if I will be able to make the 2"-2" work. If neither of these are the type I need what would be a better option? pic 2

2. I was told I could use the dirt on the right with minimal rocks to back fill the hole but didn't know if I could reuse the pile on left with more rocks? I have three buckets of similar consistency dirt on the right but will need another if the pile on the left doesn't work. I can pour the other buckets into my proper blue storage container if that will help? pic 4


3.If I need extra refill would sand be acceptable or should I purchase it from a box store?

thanks in advance for any advise and if my explanations don't make any logical meaning I will try to explain again!
 

Attachments

  • 2014-02-18 07.52.25.jpg
    2014-02-18 07.52.25.jpg
    98.7 KB · Views: 260
  • 2014-02-18 07.53.09.jpg
    2014-02-18 07.53.09.jpg
    87 KB · Views: 246
  • 2014-02-18 12.16.10.jpg
    2014-02-18 12.16.10.jpg
    98.5 KB · Views: 249
  • 2014-02-18 12.35.44.jpg
    2014-02-18 12.35.44.jpg
    49.5 KB · Views: 247
  • 2014-02-17 21.18.28.jpg
    2014-02-17 21.18.28.jpg
    61 KB · Views: 239
Last edited:

Terry

The Plumbing Wizard
Staff member
Messages
29,942
Reaction score
3,458
Points
113
Location
Bothell, Washington
Website
terrylove.com
2.5" OD is considered 2" pipe.
Going from cast iron to plastic is easy with a no-hub type coupling. If you have the cast out of the hole, then you can see about matching up the sizing with the new coupling.
Back fill with what you have there. You can also pick up a bag of sand if you're more comfortable with that.
 

Cacher_Chick

Test, Don't Guess!
Messages
5,458
Reaction score
213
Points
63
Location
Land of Cheese
After bedding plastic pipe in a trench, I surround it in coarse sand before backfilling with native soil, and then at least 3" of stone between the concrete pour and the underlaying soil. If you are doing a big area of concrete, you might also consider 2" xps foam board under the pour for insulation.

Most companies such as Fernco make couplers specifically listed for connecting ABS to cast iron.
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks