akcody
New Member
Hi all,
During what was supposed to be a quick bathroom face lift I found mold and decided to re do the drywall. I then found that the drywall was actually cut out behind the toilet tank because there wasn't enough clearance. On top of that my new tub is wider than the original, and is now crowding the toilet. Bathroom is bottom story on slab, cast iron pipes, drain is inline with the outfall to my septic tank. So here's the question, what now?
I've decided I'll have to modify the cast iron pipe accessing it through the slab. I've chipped out the concrete and dug out all around the tee. any advice one the correct way to fix this would be awesome. I have attached a pic to help clarify. Thanks in advance!
Cody
During what was supposed to be a quick bathroom face lift I found mold and decided to re do the drywall. I then found that the drywall was actually cut out behind the toilet tank because there wasn't enough clearance. On top of that my new tub is wider than the original, and is now crowding the toilet. Bathroom is bottom story on slab, cast iron pipes, drain is inline with the outfall to my septic tank. So here's the question, what now?
I've decided I'll have to modify the cast iron pipe accessing it through the slab. I've chipped out the concrete and dug out all around the tee. any advice one the correct way to fix this would be awesome. I have attached a pic to help clarify. Thanks in advance!
Cody