I am in the process of building out a bar. I am the owner and my cousin is a very good union plumber in town. Behind the bar I have a hand sink (from left to right), a 12" garbage can, a 12" dump sink, then a 3 compartment sink with drainboards on each end. The hand sink has it's own drain and the 3 compartment sink drains into a floor drain. He is telling me that the dump sink cannot drain into the floor drain if I put a faucet on it (it does not have it's own drain).
He said that if I put a faucet on the dump sink, it will have to have it's own drain (closed). Yet I can do away with the dump sink and put in a 4 compartment sink (one compartment for dump), without any issues. This doesn't seem right as the water coming out of the 3 compartment sink will be gray water.
Does anybody know what code says about this? I equipment has already arrived but has not been installed. The bar is not sheeted yet, but he's telling me I would need another drain / vent (big bucks). Something just doesn't seem right - the dump sink will be very low volume - only to rinse with hot water a few times/day.
I read the code and it looks like I drain the dump indirectly...so I guess I'm missing something.
Thanks
He said that if I put a faucet on the dump sink, it will have to have it's own drain (closed). Yet I can do away with the dump sink and put in a 4 compartment sink (one compartment for dump), without any issues. This doesn't seem right as the water coming out of the 3 compartment sink will be gray water.
Does anybody know what code says about this? I equipment has already arrived but has not been installed. The bar is not sheeted yet, but he's telling me I would need another drain / vent (big bucks). Something just doesn't seem right - the dump sink will be very low volume - only to rinse with hot water a few times/day.
I read the code and it looks like I drain the dump indirectly...so I guess I'm missing something.
Thanks