petepdx
Member
Getting ready to change the galvanized with AquaPEX in my urban 1950's rancher with full basement (easy access to everything for a change!!!)
I'm going to use 1" up to a manifold, but on the other side I can't decide if I should use 1/2 or 3/4 ?
The coming summer I'll replace the line from the meter with 1" as well.
The service meter will more then likely stay 3/4" the city wants over a $1,000 to change it from 3/4" to 1", but the option will be there.
-pete ready to order the red&blue ...
I'm going to use 1" up to a manifold, but on the other side I can't decide if I should use 1/2 or 3/4 ?
The coming summer I'll replace the line from the meter with 1" as well.
The service meter will more then likely stay 3/4" the city wants over a $1,000 to change it from 3/4" to 1", but the option will be there.
-pete ready to order the red&blue ...